Home Page
Business Profile
Services
Evaluate
Investigate
Training
Expert Witness
Publications
Contact Us

Email

    ENGINEERING SOLUTION EXAMPLES

    Marine

      Main boom winch gearbox failure
      The main boom winch gearbox on a 600 tonne floating crane in the South China Sea disintegrated and caused the boom to fall.

      We were on board within 48 hours and identified the cause as a bearing assembly error and advised how the problem could be avoided in future.

      Piston ring sticking problems, engines rated at up to 2800 kW
      Review of the development problems associated with pistons and rings with small land clearances resulting in bore polishing. Sticking was occurring with both the top and second rings.

      Modifications were recommended to certain piston rings and also the elimination of use of others.

      Services Index
      Site Map
      Home page